For building water or gas supply networks, installed buried in the ground.
– Material: PE 100 SDR 11 (ISO S5)
– 10 bar Gas / 16 bar Water (calculated for a temperature of 20°C)
– compliant with EN 1555-1:2011, ISO 4427-3, ISO 4437-3
– dimensions according to EN 12201-3:2011+A1:2012 and EN 1555-3:2010+A1:2012
– manufacturing method: injection moulding
– the strength of the electrofusion fitting is embedded in the material
– the inner surfaces of the fittings are smooth, without grooves
– welding temperature between -10°C and +45°C
– welding voltage: 40 V
– with integrated cutter for tapping pressurised pipes
– complete, with fastening clamp
– 4 mm connectors
– welding indicators with limited travel
– extra-long outlet
– threaded cap fitted with a sealing gasket
Installation must be carried out according to the installation instructions by authorised personnel.